The dates that matter for your Workers, your subcontractors' Workers and your company: documents, licences, training, form dates, status changes, audit actions, who is on site, and Project dates; in your own calendar too.

For: Contractor Administrator · Customer Administrator · Report Viewer · System AdminLast checked: 2026-11-13Open this page in Obtempera ↗

The calendar icon in the top bar, beside the mail and scan icons, opens it. It shows your own Workers, and the Workers of the subcontractors below you on the Projects where they work under you.

A Customer Administrator sees the Customer's own direct workforce. A Report Viewer sees what the administrators beside them see, except form dates and audit actions. A System Admin first chooses a Customer, then one of its Contractors (the Customer's own workforce is listed first); the choice stays in the page address, so a reload or a shared link opens the same calendar. Choosing another Contractor starts its kind buttons afresh, as that Contractor's calendar first shows them, with any kind its Customer adds (such as Site inductions) among them.

Clicking an entry opens a side panel showing what is expired, missing or waiting for that Worker on each Project, and their dates in the next 90 days. Open the full Worker record at the bottom opens the whole record.

What it shows

Switch each kind on or off with the buttons above the calendar:

  • Safety documents: documents on the EHS side of the Worker's form, such as asbestos, crane, forklift, scaffolding, first aid and medical fitness, when they expire.
  • Working documents: documents on the HR side, such as permits, A1s, posting notifications, passports, ID cards and visas, when they expire.
  • Licences and cards: your own Workers' licences and cards, when they expire.
  • Training refreshers: when a course a Project requires runs out and must be retaken.
  • Compliance status changes: what happened and when, in plain words, such as SafePass expired, Sent back by HR to correct or Cleared for site. Ahead, it shows when a required document falls due for renewal and when it expires (marked expected).
  • Form dates and reminders: the dates Workers gave on their forms, such as a posting start or end, an induction or a notification, on the day they fall. It also shows the day HR next follows up a social security number that is still to come. Each date sits on the HR or EHS side of the form, as documents do.
  • Company documents and reviews: your own company's registration documents when they expire, the day each approved company declaration comes up for its yearly review, and the last day to send a declaration a Customer has asked for before no more Workers can be added.
  • Audit actions due: follow-up actions an audit gave your company, on the day each is due, while they are still open.
  • Workers on site: for each Project and day, how many Workers are booked on site and who they are, from each Worker's planned dates. The colour is the worst of theirs today: Red if anyone is not cleared for site, Amber if a renewal is due, Green if everyone is clear.
  • Project dates: the day each Project starts and ends, where its Customer has set them.
  • Booked on site past an expiry: a required document that runs out while the Worker is still booked on site, on the day it runs out (Red).
  • 12-month posting limit: for a Worker posted from another country, Amber from 11 months after their planned start and Red at 12 months. Only those who see the HR side of the form see it.
  • Site inductions: where the Customer has Site Induction switched on, on Projects that need an induction: the day a Worker was inducted on site (Green); the day their induction refresher is due (Amber in the 30 days before it, Red once it has passed); and a Worker booked on site who is not inducted yet, on their planned start (Amber from the Project's warning days before it, Red from the start day on). Each Project sets its own warning on its page, from 0 to 365 days (7 unless changed); 0 means no early warning, Red from the start day only.

Planned dates

Each Worker's place on a Project can have a planned start and a planned last day. Both are optional. Set them on the Worker's record (open the Project row, Set dates), or for many Workers at once from the Workers list: choose them, Set planned dates, pick the Project and the dates. A date left empty there keeps each Worker's own. A Worker booked with no last day counts as on site until the Project's end date, if it has one.

They are set by whoever manages the Worker: the Contractor's administrator for its own Workers, the Customer's administrator for its own workforce. The Customer's administrator sets a Project's start and end date on the Project page.

In your own calendar, and by email

Open Your own calendar and email under the calendar:

  • Get a private feed link and add it to Google Calendar or Outlook. Each day shows how many dates of each kind fall on it and a link back here. No Worker names leave Obtempera. The link is shown once; Get a new link or Stop the feed ends the old one straight away, so each first asks you to confirm: every calendar using the old link stops updating until you add the new one to it.
  • Email me the week coming up, on Mondays sends you the next seven days' counts and a link, once a week, when there is something to tell. It is off until you switch it on.

A Report Viewer reads the calendar in Obtempera only: Your own calendar and email is not shown to them, and a feed link or Monday email they had stops.

You only see the kinds your role can already open elsewhere. A Report Viewer also sees when documents and licences expire: the document's name, the Worker and the date, nothing else from the document. Licences are shown for the calendar's own company's Workers only, as for the administrators beside them, never a subcontractor's, and never a card number. Licences, cards, training and audit actions appear only where the Customer has those add-ons switched on. Company dates are not about one Worker, so they are hidden while a subcontractor is chosen under Contractor.

Colours

  • Red: expired.
  • Amber: expiring soon. The Worker can still go to site.
  • Grey: in review.
  • Green: clear.

Views and filters

  • Month shows how many dates fall on each day. Click a day to list them. On a phone each count carries a one- or two-letter code for its kind instead of the word (L licence, T training, I induction, F form, C company, A audit, P project, G gap, Sa safety, Wk working, St status, OS on site, Po posting); the same code is on each kind's button above the calendar, and tapping a day still lists everything.
  • Week lists each day's dates.
  • List shows the next 90 days, 100 at a time.

The arrows either side of Today move a month, a week or 90 days at a time; Today comes back to now. A legend under them gives the four colours.

Narrow any view by Project, country or Contractor (your company or one subcontractor); country and Contractor appear only when there is more than one to choose from. There is no search by Worker. With every kind switched off, the calendar shows nothing.

O.B.'s tour

O.B. points out the Calendar once to a Customer Administrator, a Contractor Administrator of an outside company (not a Customer's own direct workforce) and a Report Viewer, with Show me and Open the Calendar. The tour rings the filters, Month, Week and List, and the legend: Red expired, Amber expiring soon (still fine for site), Grey in review, Green clear. On a phone the walk-through waits for a tablet or a computer: the tip's own link, or a link reading Open the page where it has none to this page, brings you here instead.