Induction

Workers cleared for site who still need their on-site induction, who has confirmed it, and whose refresher is due.

For: EHS Administrator · Customer Administrator · System AdminLast checked: 2026-11-13Open this page in Obtempera ↗

Induction is under Review in the top bar, with the number waiting. It appears only where the Customer has the Site induction add-on switched on, and only for Projects where Site Induction is switched on in the Project's Compliance Workflow. EHS Administrators of the Project or its Country, and Obtempera's System Administrators, mark inductions; a Customer Administrator can see the page but not mark. A Customer Administrator who reviews nothing else (for example one whose default HR and EHS reviewer roles were removed) still has Review in the top bar, with Induction in it. A Report Viewer and a Contractor do not have this page; they read the Induction report instead.

The page shows basic Worker data only: each row has the Worker's name and employer, the Project and the Worker's colour. Never an answer, a document or an email.

The tabs

Each tab shows its number of Workers.

  • Ready: Workers on a Project that needs an induction, cleared for site (Green, or Amber · expiring soon where something is only expiring soon) and not yet inducted there. The last column reads Not inducted yet.
  • Not ready: Red or Grey (Grey · in review) Workers, each with Why not ready (for example a document or course that needs renewing). They move to Ready by themselves once cleared.
  • Awaiting confirmation: marked inducted; the Worker has not yet confirmed in Obtempera. The row shows when it was marked and by whom, and a Green Inducted · awaiting confirmation, as on the induction report and the Worker's record: an unconfirmed induction does not hold the Worker back.
  • Inducted: marked and confirmed, with when and by whom it was marked, and when and how the Worker confirmed (in the app, by QR code, or in person).
  • Refresher due: only where a Project sets a refresher period. An induction appears here 30 days before its refresher is due (Refresher due soon) and stays once the date has passed (Refresher overdue) until the Worker is inducted again. An overdue Worker is back on Ready too.

Type a name and press Search (or Enter): a first name, a surname, or the full name as the row shows it. Or choose a Project under Filters (Every Project shows them all); Clear empties both. Starting on site under Filters narrows Ready and Not ready to the Workers whose planned start on site is that day, for example tomorrow's starters; Clear empties it too. Click a row, or the Worker's name, to open the Worker.

Marking an induction

After the on-site induction, tick one Worker or several on Ready (the box in the Worker column's header ticks every Worker shown that you may mark). A bar appears above the list with the number chosen (on a phone it stays pinned under the top bar as you scroll, so you need not scroll back up): press Mark inducted (or Mark N inducted for several); Clear unticks them all. The confirmation names the Project; the induction is recorded for today, against you.

A Worker on a Project outside your EHS scope (for example a Country where you are not the EHS Administrator) has no tick box: an EHS Administrator of that Project marks them. If one is chosen anyway, the page says the Worker's Project is outside your EHS scope.

Scan site passes ticks Workers by their site pass instead: point the camera at each Worker's pass in turn, then press Done scanning. Without a camera, tick them in the list.

Where the Project has an induction checklist, it opens in the confirmation and is ticked once for the group; a Project with a checklist is marked on its own, one Project at a time.

Each Worker is told at once, in their own language, and sees Please confirm your site induction in Obtempera, with one button to confirm (I confirm I received this induction). Until they do, they stay under Awaiting confirmation, and are reminded the next morning, then once a week. An unconfirmed induction does not hold the Worker back: your mark is what counts, and their confirmation is the evidence they received it.

Confirming by QR code or in person

On Awaiting confirmation, each group marked together has Show QR. The QR code fills the screen; each Worker scans it with their phone's camera, signs in if asked and taps to confirm their own induction. The number still to confirm drops as they do. The code renews itself every few minutes.

For a Worker who cannot confirm in Obtempera (no phone, cannot sign in), press Confirmed in person on their row and give the reason, for example signed the paper induction sheet. The record shows it was confirmed in person, by you, and why.

Withdrawing an induction

Withdraw on a row is for an induction marked by mistake. Give the reason: the induction stays on the record as withdrawn, with your reason, and the Worker goes back on Ready. Nothing is deleted.

Switching induction on for a Project

A Customer Administrator (or Obtempera's System Administrator) switches Site Induction on or off on the Project page, under Compliance Workflow; the switch is there only while the Customer has the add-on. With it on, the same place sets the Induction refresher (in months; blank for none), the Not-inducted warning on the calendar, and the Induction checklist (a Site Induction form built in Fields & Forms). See Project page.

O.B.'s tour

When Workers wait for the induction you mark, O.B. says how many and offers Show me how and Open Induction. The tour rings the tabs, the box that ticks every Worker shown, and Mark inducted. A Customer Administrator is also told once when the add-on is on but no live Project asks for an induction, with a link to a Project. On a phone the walk-through waits for a tablet or a computer: the tip's own link, or a link reading Open the page where it has none to this page, brings you here instead.